talk.kiezburn.org
Tue 22 Jun 2021 11:33AM

Signs

VRS Veroca R. Sala Public Seen by 180

This year the site layout will be different because of the new loud zones, new gate placement and those restricted areas.

Realizer: Ancka

Signs Realizer to-do

  • to make sure all signs are placed where they need to be, re make the broken ones.

  • Need to create a nice and noticeable perimeter mark ( together with site planning realizer) at the gate to ensure the limits are well marked.

  • No-go areas within the site also need to be marked.

    SIGNS

  • We need to make a no-go sign for the lakes that are all non-swimmable

  • The fire department will spray us with their hoses next to the big lake, one sign where we can announce the next time they'll do it. (Like a white board)

  • One sign to be placed at the Gate, where the Fire Safety lead can announce potential loosen up of firesaftey rules

  • Signs for showers

  • toilets

  • entrance & directions from the road to site

  • free-camping areas

  • parking areas

  • caravan parking areas

  • Security

  • Feuerwher

  • First Aid

  • Welfare

  • Rangers

  • No swimming in the lake!

  • Site Leads?

  • Bee-hive in the camper van trailer in front of the shower container (Drug Sluts)

  • silly funny signs, if one feels like to :)

(no) information:

  • We went to storage but we are still unsure which signs are in there ( it looks quite messy over there)

  • We are unsure which materials we need to make the new ones (wood, brushes paint etc). Consult with Build realizer how is the budget for this.

  • Placement still to be confirmed by Site planning reach out on this thread

P

Purzel Tue 27 Jul 2021 12:46PM

@Ancka can you confirm fir my piece of mind, please? ❤

A

Ancka Sat 10 Jul 2021 2:16PM

Vero, last year we already did some stencils. I am going to talk to Tascha about it, she might have them

A

Ancka Sat 10 Jul 2021 2:15PM

Yes, I am meeting Natascha today for planning

C

Cris Thu 24 Jun 2021 1:13PM

uff! Ok, I think I can beat that

VRS

Veroca R. Sala Fri 9 Jul 2021 3:58PM

Hi Ancka so happy to see you around here 😊

I see I see its quite laborious job I know. It is at this point rather difficult to provide more volunteers on build I think we are at full capacity. @Franzi early entry @Melinda Gonzalez volunteers kitchen. (We are 30 mouths already not counting extras)

I'm happy to help and see what we can do with the ppl we have on build from Deine Mudda. Maybe we jump in and out as needed. It is not ideal I know 😐

Some signs are already done and stored  in storage.

Do you think I can help you plan it so we minimize the work onsite as much as possible?
I'm happy to prepare or help find someone to make stencils so we only spry on the wood onsite (?) Or how to you envision it?

For installation of signs (digging and placing ) I bet you can have build collaboration @Natacha Kromatik . (?)

P

Purzel Thu 24 Jun 2021 1:09PM

Sprinkler :D

P

Purzel Thu 24 Jun 2021 1:35PM

more like this 😎

M

Mareike Fri 9 Jul 2021 5:54PM

Hey @Ancka thanks for doing signs! I will also be there during build and happy to help you with it! (And I don't need to be fed :) )

VRS

Veroca R. Sala Fri 9 Jul 2021 5:57PM

awesome! thanks Mareike!

C

Caroline Tue 27 Jul 2021 6:35PM

Thank you so much!!

Load More